听力首页 听力教程 VOA慢速 英语歌曲 外语下载 英语小说 英语词典 在线背单词 听力论坛 韩语学习
听力专题 英语教材 VOA标准 英语动画 英语考试 资源技巧 英语翻译 单词连连看 听力家园 德语学习
听力搜索 英语导读 BBC英语 英语视频 英语电台 英语QQ群 外语歌曲   英语游戏 英语网刊 日语学习
当前位置: 英语听力论坛 » 【新概念教室】 » 新概念入门第二册64
返回列表 发帖

新概念入门第二册64


       
       







Lesson 64
The Channel Tunnel
In 1858, a French engineer, Aime Thome de Gamond, arrived in England with a plan for a twenty-one-mile tunnel under the English Channel. (1)___________________________. This platform would serve as a port and a railway station. The tunnel would be well-ventilated if tall chimneys were built above sea level. In 1860, a better plan was put forward by an Englishman, William Low. (2)__________________________. This would solve the problem of ventilation, for if a train entered this tunnel, it would draw in fresh air behind it. Forty-two years later a tunnel was actually begun. If, at the time, the British had not feared invasion, it would have been completed. The world had to wait almost another 100 years for the Channel Tunnel.(3)___________________________.



New words and expressions
tunnel n. 隧道
port n. 港口
ventilate v. 通风
chimney n. 烟囱
sea level 海平面
double adj. 双的
ventilation n. 通风
fear v. 害怕
invasion n. 入侵,侵略
officially adv. 正式地
connect v. 连接
European adj. 欧洲的
continent n. 大陆



本帖隐藏的内容需要回复才可以浏览

2. He suggested that a double railway-tunnel should be built.

TOP

2. He suggested that a double railway-tunnel should be built.

TOP

1 He said it would  be possible to build a platform in the centry of the channel.
2 He suggested that the dubble railway tunnel should be built .
3 It was officially opened on March seventh 1994,finally connecting Britain to the European continent.

TOP

1. he said that would be possible to build a platform in the center of the channel.
2.he suggested that double railway tunnel should be built.
3.it was officially open on March 7,1994, finally contecting Britain to the European continent.
1

评分人数

TOP

返回列表